Ready to start improving processes?

14-day free trial       No credit card required       Start training immediately

logotype

Case Study

Imagine trying to run an expanding business while not having an accurate analysis of the revenue and expenses. That’s the problem Rhea Health was facing month-to-month. An Oklahoma business started in 2006 and growing rapidly, Rhea Health provides workforce management health services to help companies promote safe, healthy, and productive work environments.
Through the use of Lean Six Sigma, King Khalid Military Hospital reduced the number of unnecessary X-Rays for head injury patients by 55%.
The Town of Oro Valley recognizes the importance of employee training for maintaining compliance with both Town-wide and job-specific requirements. However, the current process to assign training and then track the status results in incomplete employee records and potential compliance issues with Occupational Safety and Health Administration (OSHA).
Surgical site infections (SSIs) are a serious patient risk but can be reduced with a proven pre-operative treatment. The compliance rate for providing this treatment is only 58% for pediatric patients in Intensive and Cardiac Intensive Care.
The time required to establish a medical aid station directly impacts the ability to save lives on the battlefield. Currently, the average lead time is 45 minutes. Every minute saved is lives saved.
A Pulmonary Function Testing (PFT) lab, which checks how well a patient’s lungs are working, found that its staff needed to move around too much to provide patient care.

Our learners deliver results. Jeff Owens, a beta-wp.goleansixsigma.com Black Belt and Quality Manager from Texas, reduces costs from Bent/Scratched/Damaged (BSD) scrap for building envelopes by 76%. Jeff’s

Every 45 days the Web Development Team of The Nature Conservancy in Arlington, VA conducts a new release of their Content Management System (CMS) but that entailed 7 days of lost productivity.

Project Summary The Challenge: It took UC San Diego 3-5 months to assign 2,500 classes The Discovery: 4 of 15 major tasks took 75% of

British manufacturer Solvay was experiencing increased demand for one of their long-selling resins, which was good news—but how to keep up?

No post found.